PHYSICAL VERIFICATION FOR N-POWER BATCH C (STREAM 1)

The Benue State Office of the National Social Investments Programme (NSIP) hereby informs all shortlisted candidates for N-Power Batch C Stream 1 that their Physical Verification exercise will commence from Friday, 10th to Friday, 24th September, 2021. The location of the exercise is as indicated below:

1. MAKURDI LG: Council Secretariat, Ogiri Oko Rd, Makurdi

2. GUMA L.G: Secretariat, Gbajimba Council Hall

3. GWER WEST LGC: Secretariat, Naka Council Hall

4. GWER EAST LGC: Secretariat, Aliade Council Hall

5. TARKA LGC: Secretariat, Wannune Council Hall

6. GBOKO LGC: Secretariat, Gboko Council Hall

7. KONSHISHA LGC: Secretariat,Tse-Agbaraba Council Hall

8. BURUKU LGC: Secretariat, Buruku Council Hall

9. USHONGO LGC: Secretariat, Ushongo Council Hall

10. KATSINA /ALA LGC: Secretariat, Lessel Council Hall

11. UKUM LGC: Secretariat, Sankera Council Hall

12. KWANDE LGC: Secretariat, Adikpo Council Hall

13. VANDEIKYA LGC: Secretariat, Vandeikya Council Hall

14. LOGO LGC: Secretariat, Ugba Council Hall

15. OTUKPO LGC: Secretariat, Otukpo Council Hall

16. ADO  LGC: Secretariat, Igumale Council Hall

17. OHIMINI LGC: Secretariat, Onyagede Council Hall

18. OKPOKWU LGC: Secretariat, Okpoga Council Hall

19. OJU LGC: Secretariat, Oju Council Hall

20. APA LGC: Secretariat, Ugbokpo Council Hall

21. AGATU LGC: Secretariat, Obagaji Council Hall 

22. OGBADIBO LGC: Secretariat, Otukpa Council Hall

23. OBI LGC: Secretariat, Obarike-Ito Council Hall

2. Candidates will be verified by Local Government Inspectors of the National Youth Service Corps (NYSC) through an automated system by which they will be identified by their fingerprints and then be required to present original copies of their Letters of Engagement; Academic Credentials; and Valid means of Identification for sighting.

3. Many candidates have been unable to download their Engagement Letters from the N-Power portal. The Federal Ministry of Humanitarian Affairs has advised that this is a deliberate strategy to reduce congestion at the Verification Centres. The portal will be activated at intervals within the Two (2) Weeks of Verification to allow more persons download their letters and undergo verification. In a nutshell, the Physical Verification will be done in batches.

4. Candidates who are successfully verified are to report at their Places of Primary Assignment immediately while those rejected by their PPAs or who have associated issues can approach the Benue NSIP Office at Atom Kpera Lodge, Lobi Quarters, Makurdi for assistance. 

*Dr. Terris Damsa FTPD,FIMC,CMC*

State Focal Person

Published by 9JA INNER EAR BLOG

No: 1 update box

Leave a comment

Design a site like this with WordPress.com
Get started